An overview of the technical properties of ARCave® vault cellars
Component Recess Vault Apex
Diagonal Cross-Ventilation
Sealing
The vaults should be 100% sealed against moisture (seek specialist advice)
.Insulation
In the case of little earth covering and in interior installation heat insulation should be installed.
Rear Padding
with stone-free earth in two-sided layers of 50 cm each
Load
The vaults are checked for static. Floor load is a total of 2000 kg/m2
Construction work (by your local mason/not exhaustive) ARCave is solely the manufacturer. We deliver on site. The actual placement is done by a local construction company:
Approvals
Excavation
Foundations / Base plates
Strip foundations; in the event of a vault length in excess of 3m a cross bolt is necessary
Montage / assembly is done by your local construction company
2-3 man montage personnel, montage shoots, wood chocks
Sealing against rising moisture
Inlay of electricity supply
Laying out of vault components
100% water-proofing, heat insulation if necessary
Connections - house - vault, partitions if necessary, steps
Careful rear padding
Doors, windows, ventilation, lighting, water connections if necessary, interior plastering, interior installation
All information concerning prices, services and fitting are in keeping with our offers the day this brochure (electronic document) goes to press. ARCave reserves the right to change their product, fittings, delivery deadlines and services at any time, as well as prices in case of a printing mistake. The models presented include accessories available at your local construction company.